dvbbs
收藏本页
联系我们
论坛帮助
dvbbs

>> Special Board For English(talking about the things about pumps and valves,such as the technoligy,the market and so on)
搜一搜相关精彩主题 
国际泵阀采购论坛-泵水泵油泵螺杆泵液下泵离心泵阀阀门采购阀门销售泵阀论坛English OnlyEnglish Only → CHILEAN-ARGENTINE COPPER, GOLD, AND SILVER PROJECTS ADVANCE TO NEXT STEPS. . .

您是本帖的第 1370 个阅读者
树形 打印
标题:
CHILEAN-ARGENTINE COPPER, GOLD, AND SILVER PROJECTS ADVANCE TO NEXT STEPS. . .
贵州水泵厂
帅哥哟,离线,有人找我吗?
等级:泵阀元老
文章:151
积分:1401
门派:无门无派
注册:2007年4月7日
楼主
 用支付宝给贵州水泵厂付款或购买其商品,支付宝交易免手续费、安全、快捷! 点击这里发送电子邮件给贵州水泵厂

发贴心情
CHILEAN-ARGENTINE COPPER, GOLD, AND SILVER PROJECTS ADVANCE TO NEXT STEPS. . .

CHILEAN-ARGENTINE COPPER, GOLD, AND SILVER PROJECTS ADVANCE TO NEXT STEPS. . .
Argentina’s mining minister, Jorge Mayoral, met with Chile’s mining authorities during August 30 and 31 in Santiago de Chile, so as to agree on the advances of the projects involved in the bi-national mining treaty signed between those two countries in 1996.

There are four main projects involved in the treaty: Pascua Lama Gold, Las Flechas copper-gold, Vicuna copper-gold and El Pachon copper. Three of these projects are located in the Chile-Argentina border; however, even though El Pachon is placed in Argentinean territory, its location is part of the territory previously embraced in the bi-national mining treaty.

ip地址已设置保密
2007/9/29 15:10:16

G型系列螺杆泵请找上海龙亚耐腐蚀泵制造有限公司,销售热线:O21-3351O117,3351O177,3351O187,l8964996577更多请参考:http://www.pump-factory.cn/product/G.htm

贵州水泵厂
帅哥哟,离线,有人找我吗?
等级:泵阀元老
文章:151
积分:1401
门派:无门无派
注册:2007年4月7日
2
 用支付宝给贵州水泵厂付款或购买其商品,支付宝交易免手续费、安全、快捷! 点击这里发送电子邮件给贵州水泵厂

发贴心情

Barrick Gold is currently operating the $2.4 billion Pascua Lama gold project. According to the Canadian company’s representatives, since they are working hard to meet development deadlines and obtain permits from Chile and Argentina, Barrick expects to begin the project in the first quarter of 2008. During the first five years, Pascua Lama is to have a production capacity of 775,000 of gold and 35,000 of silver per year.

Tenke Mining’s subsidiaries Desarrollo de Prospectos Mineros SA in Argentina and Minera Frontera de Oro in Chile are planning to invest in Las Flechas copper-gold project, located in Northern San Juan province (Argentina) and Huasco province in Region III (Chile) $6.8 million and in Vicuna project in San Juan’s Iglesia department and Copiaco province also in region III $5 million.

Through such investment, the Canadian company and its subsidiaries are to set up camps, drilling, geophysical studies and sampling. Argentina has already granted the necessary permission to create the pass on the Argentine side to facilitate exploration at Vicuna; Tenke expects to receive the same permission from Chile’s Government.

Xstrata Minerals is operating the El Pachon located in the Argentinean province of San Juan. Investment on this copper project has been estimated in $1.9 billion and the Swiss company has recently announced that the studies to determine the activities onsite will be finished by mid January 2008. (Source: Industrial Info Resources)

ip地址已设置保密
2007/9/29 15:10:27

聚惭偏氟乙烯泵,PVDF,化工泵,耐腐蚀泵,耐酸泵,PF请找上海龙亚耐腐蚀泵制造有限公司,销售热线:O21- 3351O117,3351O177,3351O187,l8964996577更多请参考:http://www.pump-factory.cn/product/pf.htm

湖南水泵厂
帅哥哟,离线,有人找我吗?
等级:泵阀元老
文章:582
积分:5714
门派:无门无派
注册:2007年4月4日
3
 用支付宝给湖南水泵厂付款或购买其商品,支付宝交易免手续费、安全、快捷! 点击这里发送电子邮件给湖南水泵厂

发贴心情

Xstrata Minerals is operating the El Pachon located in the Argentinean province of San Juan. Investment on this copper project has been estimated in $1.9 billion and the Swiss company has recently announced that the studies to determine the activities onsite will be finished by mid January 2008. (Source: Industrial Info Resources)...

my GOD..

ip地址已设置保密
2007/10/10 14:27:42

SZ-270水环式真空泵, SZ-0.5水环式真空泵, SZ-1水环式真空,SZ-2水环式真空泵, SZ-3A水环式真空泵,请找上海龙亚耐腐蚀泵制造有限公司,销售热线:O21-3351O117,3351O177,3351O187,l8964996577更多请参考:http://www.pump-factory.cn/product/SZ.htm


 3   3   1/1页      1    
泵阀贸易 泵阀交易 买水泵 卖水泵 买阀门 卖阀门 找水泵厂 水泵厂找代理商 找阀门厂 阀门厂招代理商 快上 国际泵阀贸易网 International Website For Pumps And Valves
Copyright ©2000 - 2008 Pvwww.Com
页面执行时间 0.37500 秒, 4 次数据查询