以文本方式查看主题 - 国际泵阀采购论坛-泵水泵油泵螺杆泵液下泵离心泵阀阀门采购阀门销售泵阀论坛 (http://www.pvwww.com/pvbbs/index.asp) -- English Only (http://www.pvwww.com/pvbbs/list.asp?boardid=14) ---- BDNES APPROVES $856 MILLION FOR FOZ DE CHAPECO HYDROELECTRIC PLANT IN BRAZIL . . . (http://www.pvwww.com/pvbbs/dispbbs.asp?boardid=14&id=7324) |
-- 作者:贵州水泵厂 -- 发布时间:2007/9/29 15:15:44 -- BDNES APPROVES $856 MILLION FOR FOZ DE CHAPECO HYDROELECTRIC PLANT IN BRAZIL . . . BDNES APPROVES $856 MILLION FOR FOZ DE CHAPECO HYDROELECTRIC PLANT IN BRAZIL . . . Foz do Chapelco is made up of CPFL Geração de Energia (Sao Paulo, Brazil), 51 percent stake, Chapecoence Geração, 40 percent, which is a joint venture between Brazil’s power company Furnas and the Pentagono trust fund, and the state owned power generation and transmission company, CEEE (Rio Grande do Sul, Brazil) with 9 percent. |
-- 作者:贵州水泵厂 -- 发布时间:2007/9/29 15:15:54 -- The loan granted by BDNES for the construction of the new 855-MW plant represents 75 percent of the total investment estimated at $1,185 billion. Of the whole loan, $593 million are to be granted in direct financing to the Foz do Chapeco Energia consortium, the remaining $297 million through Bradesco, Santander, Banco do Brasil and Safra Banks. According to Enio Schneider, Foz do Chapeco General Director, the remaining 25 percent of the total investment will be provided by the consortium itself. The new hydroelectric plant will start operations by August 2010, when its first turbine starts operation. Foz do Chapeco plant is to reach full capacity by March 2011, when its fourth turbine comes online. Schneider assured that 60 percent of the power that will be generated by this new hydroelectric plant has already been sold and the remaining 60 percent is to be sold in future government auctions. (Source: Industrial Info Resources) |
-- 作者:广东水泵厂 -- 发布时间:2007/11/28 8:37:54 -- ![]() |
-- 作者:山东水泵厂 -- 发布时间:2007/12/5 18:54:57 -- oh ,my god. |